Most GCs find out too late. FMG Services Group handles post-construction closeout for South Florida's general contractors — fully insured, workers' comp covered, OSHA-compliant, and documented from day one. We show up. We finish. You hand over a space you're proud of.
Request a QuoteThe owner walk-through is not the time to find out your closeout sub missed something. By then the punch list is your problem, the CO is delayed, and the relationship you spent 18 months building is taking damage.
Most closeout subs treat the finish line like an afterthought. They show up late, document nothing, and disappear when the punch list comes back. You've seen it. You've paid for it.
FMG was built for the GCs who are done taking that risk.
"You did 18 months of good work. Don't let the last two weeks undo it."— Vanessa Mejia, Founder · FMG Services Group
"I've been on the GC side of closeout. I know what a bad sub at turnover costs — not just money, but the owner relationship, the next project, the reputation you spent years building. I built FMG to be the sub I always wished existed."
FMG Services Group was founded by Vanessa Mejia — a construction professional with 20+ years working on commercial builds across South Florida. She understands the documentation, the access restrictions, the sequencing — because she has lived it from the inside.
As a certified WOSB, FMG also helps GCs meet M/WBE participation goals on public and private projects — without any trade-off in execution.
No runaround. No surprises. Everything in writing before we arrive.
Send us your project details. We respond within one business day with scope and pricing — clear, written, no ambiguity.
Before we arrive, you have a written scope, agreed deliverables, and a documented sign-off process. No verbal agreements. No assumptions.
Clean, inspection-ready, fully documented. Owner walk-through ready. CO on time. The relationship protected.
The GCs who use FMG hand over spaces they're proud of. Owners notice. Relationships hold. The next project follows.
A clean, documented closeout isn't just about the space — it's about what it says about you as a GC. That's what we protect.
The ones who don't — keep gambling on subs who treat closeout like an afterthought. Keep absorbing the punch list fallout. Keep explaining to owners why the finish line looked different than the rest of the project.
Everything scoped in writing, executed to your contract standard, signed off with full documentation.
Complete interior deep-clean — all surfaces, windows, fixtures, floors — to owner-turnover standard. We know what inspectors look for and we don't leave until it passes.
Construction waste, leftover materials, and dumpster coordination handled start to finish. We clear it clean so you can close the project on schedule.
Inspection-ready staging, punch-list support, and complete scope documentation. We prepare the space — and the paperwork — for the owner walk-through.
Minor drywall repairs, paint touch-up, and surface restoration. Walls and finishes delivered to the standard the owner expects to see.
Dust in a data center isn't cosmetic — it causes equipment failure, voids manufacturer warranties, and creates liability that lands on the GC. Mission-critical environments require a mission-critical clean.
FMG cleans to ISO 14644-1 Class 8 — the ASHRAE-recommended cleanliness standard for IT facilities — using HEPA-filtered equipment, anti-static protocols, and zone-by-zone documentation. We understand the requirements before we arrive.
Most GCs need to hit M/WBE subcontractor participation thresholds on public projects, government-funded builds, and large private contracts with diversity requirements. When you bring FMG onto your project, our WOSB certification counts directly toward those goals.
One closeout subcontract. Two wins — a clean turnover and a documented diversity participation credit. For projects tied to federal set-aside requirements, our SAM.gov registration means we are already vetted and eligible. You bring us in, we help you check the box.
Enterprise GCs require strict subcontractor compliance. FMG is built to clear it — so your vendor onboarding is smooth and your project liability is protected.
Send us your project details. We respond within one business day — scope, pricing, no runaround.